Status: the common evidence model below is proposed; the local pilot implements the bounded automation subset. Its machine schemas live in tools/process/schemas.

On this page


Record states and ownership

Keep these states separate:

Record Example states Meaning
Execution PASS, FAIL, BLOCKED, INFRA_ERROR, NOT_RUN What happened to planned work. Preserve native statuses through a declared mapping.
Control assessment MET, PARTIAL, MISSING, NOT_APPLICABLE Local evidence judgment, as already defined by OSSF-001.
Acceptance decision Approved, changes requested, pending Authorized decision for an identified revision and scope.

A complete plan with all applicable required results is an input to acceptance. It does not manufacture review independence, maintainer availability, training, organizational scope approval or SPICE process capability. Only permitted applicability decisions can exclude a required criterion. Store a missing owner or credential as a prerequisite gap rather than passing it through an empty execution.

Each assessment row should include the following fields; the catalog format is proposed:

Field Content
Identity Local control ID, external framework/edition/criterion, obligation and mapping rationale.
Scope Product or mock, component, target/configuration and applicability decision.
Policy and procedure Exact versioned section and the responsible role.
Implementation Existing script, configuration or human practice that performs the control.
Expected evidence Required observation and acceptance conditions before execution.
Observed evidence Immutable run/artifact reference, content digest and actual result.
Review Reviewer identity, decision time, assessed revision and unresolved findings.
Lifecycle Classification, retention owner, expiry/reassessment condition and permitted deviation.

For example, link the badge's test_policy_mandated criterion to the adopted testing policy and to evidence of its application. Map verification evidence to outcomes in the explicitly selected SPICE model. Use SWE.4 only for a mapping that selects Automotive SPICE and reviews that sector scope. For OSPS-BR-01.03, examine actual untrusted-code isolation and credential boundaries, not only a YAML permission line. Select TISAX ISA item identifiers only after the organization chooses its applicable assessment catalog.

For each execution, retain the commit and dirty-state identity, specification/configuration digests, plan digest, run/attempt IDs, tool versions, host/target identity, command arguments, start/end, exit status and expected versus returned cases. Include hashes of logs and artifacts, the required-output inventory, and references to human decisions. A hash supports content identity; provenance also needs a trusted producer and protected storage or an appropriate attestation.

Write local working records under .cache/logs/ or the existing campaign paths. The cache policy treats these as disposable. Promote selected results into a controlled artifact store or the immutable release evidence tree, with retention, access control and retrieval checks. Cache existence is not evidence retention. A mutable "latest" URL is insufficient for a historical decision.

Use an approved restricted store for private reports, access records, personnel data and incident details. The public mapping may reference a sanitized summary or an opaque evidence identifier with an access owner. Record the retention period required by the project's obligations rather than inventing a universal duration.


CICD-011: Failure and evidence handling

Class: ANALYZABILITY. Obligation: project requirement.

Keep failures visible. Record the command, exit status, selected scope, and tool identity. A timeout, missing tool, skipped platform, and failed assertion have different meanings. Product campaigns must preserve raw logs and machine-readable results under the SDD evidence contract. Current Actions logs are not a complete implementation of that proposed evidence store.

For release evidence, use immutable artifact names tied to source identity and verify their contents on download. Preserve failure diagnostics without publishing secrets or attacker-controlled executable content. Retention must cover the release's support period; the current 30-day Actions artifact is temporary storage.


Requirement evidence graph

The control catalog now declares requirements, design references and verification IDs. Catalog and plan schema version 2 requires these links; version 1 plans must be regenerated. Existing LMA-ENG-001 through LMA-ENG-004 remain stable identifiers for engineering requirements. Product requirements retain their SDD identifiers and need actual executable verifiers before enrollment.

flowchart LR
    Requirement[LMA-ENG-001] --> Design[LMA-DES-TOOLCHAIN-001]
    Requirement --> Verification[LMA-TEST-UNIT-001]
    Verification --> Control[LMA-CTRL-LOCK-PARSER]
    Control --> Result[result.json and log digests]
    Result --> Graph[evidence.json]

Each requirement declares a nonempty design list and a nonempty verification list. A verification maps to one registered executable control and declares its kind. The bounded catalog currently supports unit, analysis and integration checks. Formal, stress and benchmark enrollment needs executable acceptance contracts; an invented link must not imply completed coverage.

The engine rejects duplicate IDs, dangling references, orphan nodes, untraced controls and verification links assigned to another requirement. One requirement may need several verifications; every observation must pass for that requirement to pass. Failed verifications preserve their native status, including timeout and infrastructure failures, while the requirement receives FAIL.

Every completed run writes evidence/evidence.json, following the evidence schema. It binds the graph to the run, plan, policy and source digests. Each requirement contains its statement, design IDs and evidence entries with verification ID, kind, control, status, artifact path and SHA-256. Paths are relative to the evidence directory. The referenced result.json binds the command, observation and stdout/stderr hashes.

The gate checks the complete inventory, result hashes, log hashes, commands and completion markers before reconstructing the graph and comparing it with the retained document. Missing or altered links and artifacts block the gate. An interrupted run may lack a graph; the campaign still attempts gate and report finalization and returns failure. The graph preserves execution outcomes, while gate.json records the integrity verdict. The existing producer trust and human acceptance boundaries still apply.

The process-ci task runs these four engineering controls through the same Lua campaign locally and in CI. It does not replace the broader build, qualification, release or reproducibility campaigns. The hosted adapter retains the graph with the process logs. Its digest comes from the candidate catalog for regression evidence; this is not a protected policy approval or a release authorization.


SDD coverage boundaries

Product contract Current evidence Work still required
Documentation gates Markdown, spelling, links, C-guide examples SDD snippet extraction and semantic product checks
Release reconstruction Source packaging recipe and checksum Independent reconstruction, frozen binary inputs
Strict core dependencies Design contract only Implemented core, link maps, undefined-symbol audit
Build trust Pins, verified downloads, workflow audits Product profile provenance and release promotion
Campaign evidence CI logs and source artifact Replayable campaign manifests and raw results
Qualification matrix C-guide compiler profiles Native, emulated, ABI, ISA, and product capability jobs
GC evidence Specification only GC implementation and graph-oracle campaigns